The Construction of the First Lachine Canal, 1815-1826

Type of resource
Author/collaborator
Title
The Construction of the First Lachine Canal, 1815-1826
Abstract
An account of the factors which led to the building of the Lachine Canal and the problems encountered during construction. Studied are the promotion, finance, construction and labour that went into the building of the "water bridge". The labour used to dig the canal was composed almost entirely of Irish immigrants.
Type
Master's thesis
University
McGill University
Place
Montreal
Date
1960
# of Pages
125p.
Language
en
URL
Notes
Citation
Tulchinsky, Gerald J. J. “The Construction of the First Lachine Canal, 1815-1826.” Master’s thesis, McGill University, 1960. http://www.collectionscanada.gc.ca/obj/thesescanada/vol2/QMM/TC-QMM-112940.pdf.
Find in a library
Permalink